-
Floor paint materials
-
Epoxy primer
-
Epoxy Tue
-
Epoxy topcoat
-
Epoxy coating
-
Water-based floor materials
-
Hardened and wearable
Service Hotline:
0760-88853528
Epoxy Floor Varnish
Tian Bai KC-D-525 epoxy floor varnish
Introduction |
Two-component epoxy floor varnish for floors. Applicable to low floor of general factories, warehouses, buildings, shops and indoor parking lots. |
Features |
Has all the excellent properties of half-light low floor paint. Excellent chemical resistance and oil resistance. With excellent wear resistance, it can withstand the forklift's back and forth. |
Specifications |
Color: for a variety of colors Gloss: half-light, matte. Theoretical coating rate: coating rate of 4 ~ 5 square meters / kg. Due to different substrates and different. In addition, the construction method, the conditions of use, and the flatness of the coating surface also affect the actual coating rate. Packaging: Group A: 15kg/barrel (primary paint), Group B: 3kg/barrel (curing agent). Shelf life: at least 12 months without opening. |
Construction method |
Use with epoxy floor paint. The specific construction method refers to the use of topcoats. |
Storage shelf life |
Avoid construction when the ambient temperature is below 50C or above 350C and the air temperature is greater than 85%. Make sure the floor is completely dry (water content less than 8%, PH less than 9). Construction site to prevent open flames. Increase ventilation. After 24 hours (200C), talent can walk on it. To avoid contaminating the skin and eyes or inhaling excessive fog, use protective glasses, masks, gloves, and other protective equipment. Avoid children's contact. Product introduction Composition The modified epoxy resin, auxiliaries and solvents form part B, and part A is a curing agent. Features Light color, fast drying, high film hardness, wear resistance, can protect the front coating Uses For various colors epoxy floor cover, play a protective role. Colour Water white Light Bright Theoretical 10㎡/㎏,(With 30 micron dry film, no loss) Weight Approximately0.9 Drying time 25℃ Dry≤2h,Hard work≤24h,Fully cured 7d Flash point 30℃ Storage period 12 Months Matching ratio A: B=1:3.5 Applicable 25℃ 8h Coating method Spray, Brush, Roller Painting interval 25℃ Shortest 24h,longest48 h Surface treatment Paints must not be painted or stained to ensure a clean surface. Precautions The varnish should be applied within 24-48 hours of the construction of the paint floor. It must be polished for a long time to increase the interlayer adhesion. A and B can only be mixed after mixing. Hardened coating can be put into use after 7d. |