Material Center

Epoxy Floor Varnish


Epoxy Floor Varnish

Tian Bai KC-D-525 epoxy floor varnish

Introduction

 

Two-component epoxy floor varnish for floors. Applicable to low floor of general factories, warehouses, buildings, shops and indoor parking lots.

Features

 

Has all the excellent properties of half-light low floor paint.

Excellent chemical resistance and oil resistance.

With excellent wear resistance, it can withstand the forklift's back and forth.

Specifications

 

Color: for a variety of colors

Gloss: half-light, matte.

Theoretical coating rate: coating rate of 4 ~ 5 square meters / kg. Due to different substrates and different.

In addition, the construction method, the conditions of use, and the flatness of the coating surface also affect the actual coating rate.

Packaging: Group A: 15kg/barrel (primary paint), Group B: 3kg/barrel (curing agent).

Shelf life: at least 12 months without opening.

       
   
Construction method

 Use with epoxy floor paint.

 The specific construction method refers to the use of topcoats.

   
Storage shelf life

 

Avoid construction when the ambient temperature is below 50C or above 350C and the air temperature is greater than 85%.

Make sure the floor is completely dry (water content less than 8%, PH less than 9).

Construction site to prevent open flames. Increase ventilation.

After 24 hours (200C), talent can walk on it.

To avoid contaminating the skin and eyes or inhaling excessive fog, use protective glasses, masks, gloves, and other protective equipment.

Avoid children's contact.


Product introduction

Composition    The modified epoxy resin, auxiliaries and solvents form part B, and part A is a curing agent.

Features       Light color, fast drying, high film hardness, wear resistance, can protect the front coating

Uses           For various colors epoxy floor cover, play a protective role.

Colour         Water white

Light          Bright

Theoretical    10㎡/㎏,(With 30 micron dry film, no loss)

Weight         Approximately0.9

Drying time    25℃  Dry≤2h,Hard work≤24h,Fully cured 7d

Flash point    30℃

Storage period 12 Months

Matching ratio A: B=1:3.5

Applicable     25℃  8h

Coating method       Spray, Brush, Roller

Painting interval    25℃  Shortest 24h,longest48 h

Surface treatment    Paints must not be painted or stained to ensure a clean surface.

Precautions    The varnish should be applied within 24-48 hours of the construction of the paint floor. It must be polished for a long time to increase the interlayer adhesion.

A and B can only be mixed after mixing.

Hardened coating can be put into use after 7d.



Related tags:环氧艺术地坪漆

share it One key to share
share it One key to share